From selling sanitary products in 1929 to 1,855 MW of power generation.

Milestones

Almost a century of history

2019
  • Issuance of Negotiable Obligations Generación Mediterránea S.A. Class X and Co-issuuance of Generación Mediterránea S.A. and Central Térmica Roca S.A. Class III. Both issuances for a total of U$S 54 MM.
  • International Bond co-issuance (Reg D/Reg S). Generación Mediterránea S.A. and Central Térmica Roca S.A. U$S 80 MM, maturity May 2023
  • Start of production and sale of vapor in project Cogeneración Timbúes, vapor phase (240 tn)
2018
  • Start of operations of combined cycle in Central Térmica Roca power plant (60 MW).
  • Start of operations stage 2 CT Ezeiza (50 MW) and stage 2 CT Independencia (50 MW)
  • Start of operations of project Cogeneración Timbúes, electric energy phase (170 MW)
2017
  • Reopening International Bond (144/Reg S). Co-Issuance Generación Mediterránea S.A. and Central Térmica Roca S.A. U$S 86 MM, maturity July 2023
  • Co-issuance of Generación Mediterránea S.A. and Central Térmica Roca S.A. Class I for a total of U$S 30 MM.
  • Start of operations stage 1 CT Ezeiza (100 MW)
  • Start of operations stage 1 expansion CT Independencia (50 MW)
  • Start of operations expansion CT Mediterránea (100 MW)
  • Start of operations expansion CT Riojana (50 MW)
  • Albanesi Energía S.A. International Syndicated Loan of U$S 175 MM under Project Finance – Cogeneration Project (170 MW)
  • Generación Mediterránea S.A. issues notes in pesos and dollars, for a total amount of U$S 70 MM
  • Merger of Generación Mediterránea S.A. with Generación Frías S.A.
2016
  • Award of 420 MW under Public Bidding (Res 21/2017). This award, together with the 210 MW already under construction, represent a total future expansion of 630 MW for the Group
  • International Bond co-issuance (144/Reg S). Generación Mediterránea S.A., Generación Frías S.A. and Central Térmica Roca S.A. U$S 250 MM, 7 years term
  • Merger of Generación Mediterránea S.A. with Generación Independencia S.A., Generación Riojana S.A. and Generación La Banda S.A.
2015
  • Start of operations Generación Frías S.A. (60 MW)
  • Central Térmica Roca S.A. issues notes of 5 year term
  • Albanesi S.A. enters under Public Offering Regime
2014
  • Central Térmica Roca S.A. enters under Public Offering Regime
2013
  • Start of operations after 2nd refurbishment Generación Rosario S.A. (reaches 140 MW)
  • Generación Independencia S.A. enters under Public Offering Regime
2012
  • Start of operations Central Térmica Roca S.A. (130 MW)
  •  Purchase of Generación La Banda S.A.
2011
  • Purchase of Central Térmica Roca
  • Start of operations Generación Independencia S.A. (120 MW)
  • Start of operations after repair works Generación Riojana S.A. (40 MW)
  • Start of operations after 1st refurbishment Generación Rosario S.A. (80 MW)
2010
  • Start of operations 2nd expansion Generación Mediterránea S.A (60 MW)
2009
  •  Start of operations Solalban Energía S.A (120 MW)
  •  Public Offer Trust Albanesi S.A. Gas (Series I - $ 170 million)
2008
  • Start of operations 1st expansion Generación Mediterránea S.A (120 MW)
  •  Solalban Energía S.A. was founded in association with Solvay Indupa
2007
  • Sale of the shareholding in Central Térmica Piedra Buena (620 MW)
2005
  • Purchase of Generación Mediterránea S.A. (70 MW)
2004
  • Purchase of the shareholding in Central Térmica Piedra Buena (620 MW)
2000
  • We obtained the license to trade electric energy
1992
  • RGA starts operating as natural gas trader
1987
  • Construction of Trunk Gas Pipelines in the province of Santa Fe (650 Km) by RGA
1929
  • Start of operations of Albanesi Group

For companies

Buy your power from the company that generates it

If your company consumes 300 kW or more, it can stop paying the Res. 976 charge and the energy taxes on the distribution company bill. We show you how much you can save.

Write to us at comercialenergia@albanesi.com.ar